Changes between Version 9 and Version 10 of PublicPages/CosmoRepo
- Timestamp:
- Aug 22, 2014 10:31:08 AM (10 years ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
PublicPages/CosmoRepo
v9 v10 2 2 3 3 [[PageOutline]] 4 5 == Introduction == 4 6 5 7 The NERSC Cosmo Data Repository co-locates cosmological survey data to facilitate the analysis of multiple datasets. … … 9 11 [http://portal.nersc.gov/project/cosmo/ HTTP interface to those files under www] 10 12 11 == Staging area vs. final data==13 == Top-level structure of the Repository == 12 14 13 `/project/projectdirs/cosmo/staging/` is intended for temporary staging work and preparation of data releases, 14 and is writable by any member of the cosmo group. 15 Conceptually, there are five areas of the repository: 15 16 16 After these data are ready, they can be moved into a final `cosmo/data/{survey}/{release}/` directory. 17 That area is restricted to the cosmo project user to ensure some level of consistency for the 18 data written there. This process should be viewed like SDSS data releases: the data are processed and 19 organized elsewhere, and then when finalized (and only then) they are moved into the final data release 20 directories, controlled by the cosmo user. Once written and released, these data are frozen -- never 21 updated nor removed. 17 1. Staging area for raw data 18 1. Work area for data processing 19 1. Final data release area 20 1. Area for web access 21 1. Area for software 22 23 First, data is copied from elsewhere to the staging area in preparation for processing. Processed data is written to the work area. After the processed data are finalized, they can be moved into a final `cosmo/data/{survey}/{release}/` directory. That area is restricted to the cosmo project user to ensure some level of consistency for the data written there. This process should be viewed like SDSS data releases: the data are processed and organized elsewhere, and then when finalized (and only then) they are moved into the final data release directories, controlled by the cosmo user. Once written and released, these data are frozen -- never updated nor removed. 24 25 Here is the specific directory layout: 26 27 /project/projectdirs/cosmo/staging/ :: This is the staging area. Each survey has a directory under staging/. 28 /project/projectdirs/cosmo/work/ :: This is the work area. Each survey has a directory under work/. 29 /project/projectdirs/cosmo/data/ :: This directory is intended for final, static data releases. 30 /project/projectdirs/cosmo/www/ :: This directory provides HTTP access to the repository. 31 /project/projectdirs/cosmo/software/ :: This is for software needed by the cosmo group. 32 33 == Cosmo User Account == 22 34 23 35 Currently Ben, Dustin, and Stephen have access to the cosmo user account via: … … 33 45 }}} 34 46 47 == Data Sets == 35 48 36 == 2MASS data==49 === 2MASS data === 37 50 38 == DECam Data==51 === DECam Data === 39 52 40 53 [attachment:decam-exposures.fits.gz FITS file with coordinates of all DECam images through 16 June 2014] 41 54 42 == SDSS Data==55 === SDSS Data === 43 56 44 57 $BOSS_PHOTOOBJ=/project/projectdirs/cosmo/data/sdss/pre13/eboss/photoObj.v5b/ :: 45 58 SDSS photometric catalogs 46 47 59 $PHOTO_SWEEP=/project/projectdirs/cosmo/data/sdss/pre13/eboss/sweeps/eboss.v5b/ :: 48 60 SDSS trimmed photometric catalogs (datasweep files) used for SDSS-IV/eBOSS target selection 49 50 61 $PHOTO_RESOLVE=/project/projectdirs/cosmo/data/sdss/pre13/eboss/resolve/2013-07-29 :: 51 62 SDSS photometric resolve information defining SDSS footprints, sky areas, and primary identifications of catalog objects 52 63 53 == WISE data==64 === WISE data === 54 65 55 66 $WISE_IMAGE_DIR=/global/project/projectdirs/cosmo/data/merge/merge_p1bm_frm :: 56 67 WISE Level 1b pixel-level images 57 58 68 /global/project/projectdirs/cosmo/data/unwise :: 59 69 Dustin Lang's unWISE image stacks at full WISE resolution