DECam Legacy Survey Principles

PIs : Schlegel & Dey
Survey Leads:

  • Observing team lead: Arjun Dey
  • Tiling & Scheduling team lead: Adam Myers
  • Data team lead: Peter Nugent
  • Tractor team lead: Dustin Lang
  • Photometric calibration lead: Doug Finkbeiner

Project Goals

The DECam Legacy Survey of the SDSS Equatorial Sky has been approved to create a public optical imaging survey to complement the spectroscopic database of SDSS, SDSS-II, SDSS-III/BOSS and the start of SDSS-IV/eBOSS. We will image 6700 deg2 of this footprint using the DECam instrument from Fall 2014 through Spring 2017. The PIs are committed to enabling the science cases of collaboration members and to provide the promised catalog-level public data releases every 3 months during the period of the survey.

Membership

Co-I’s are participants of the Legacy program. Students and postdocs working directly with those co-I’s will be added as participants upon request to the PIs. Additional requests for membership would be expected to bring value to the collaboration, and would be considered on an individual basis. Applicants for membership should submit requests describing their proposed project or collaboration with an existing project. The PIs will consult with leads of posted projects to avoid conflicts with those projects.

Data access

Raw data for this program is immediately public. A set of reductions as laid out in the Data Release Plan will be made public on approximately 3-month timescales, as promised in the approved NOAO program. Members will have access to the contents of these releases prior to those releases, with the only restriction that proper citations be included in papers.

Data products, software, analyses, and ancillary data sets produced by any group of participants and not included in the Data Release Plan are proprietary to that group, unless and until explicitly shared with other participants.

Publications

Technical and scientific publications will be expected to follow the standards of scholarly publications. The standards for AAS journals can be found here:

http://iopscience.iop.org/0004-637X/page/Ethics%20policy

There is no notion of key projects or “builders” with authorship rights. There is an expectation that authorship be extended to participants who have contributed to any paper beyond already-published work. Papers should be announced and posted at least 14 days prior to journal submission to allow other participants to provide comments and to request authorship when appropriate. Posting of conference proceedings is encouraged.

Project announcements

We require that technical and scientific projects and papers be announced on the decam-legacy e-mail list and posted on the Projects page of the wiki. The invitation to involve other participants is encouraged but not required. The list of participants in each project will be maintained on this page.

The e-mail list, wiki, and svn repository will provide collaboration tools for projects. Project titles and abstracts should be posted early enough to allow for useful contributions from the particpants.